In Brief

  • The industrial carbon tax in Canada is industrial carbon pricing. In most provinces, large facilities pay for emissions above a limit set for their output, and earn credits when they emit less [4][5].
  • The consumer fuel charge has been zero since April 1, 2025. The federal Output-Based Pricing System (OBPS) remains in effect, and most provinces run their own industrial systems [1][3][5].
  • The federal OBPS applies in Manitoba, Prince Edward Island, Yukon and Nunavut. Saskatchewan paused its industrial carbon price from April 1, 2025. Its August 27, 2026 financial report still records electricity-sector amounts under the program for federal requirements [1][3][17][24].
  • On May 15, 2026, the federal government set one path to 2040 for the headline price, the price per tonne every industrial system is to set. The federal schedule and the B.C. and Ontario rules still list the older, higher path [1][3][11][16].
  • Facilities settle what they owe with credits, offsets and payments, within each system's rules and deadlines [1][9][12].

What Is the Industrial Carbon Tax in Canada?

The industrial carbon tax in Canada is the price large industrial facilities pay for their greenhouse gas emissions. Governments call it industrial carbon pricing. In most provinces it runs as an output-based pricing system: a facility that emits more than a limit set for its output pays for the excess or submits credits, and one that emits less earns credits it can sell or bank [4].

Under an output-based system, it is not a charge on every tonne. A facility pays only for its emissions above the limit, so it saves money or earns credits each time it cuts its emissions per unit of product [4][5].

Each province and territory can design its own system, as long as it meets the federal minimum standards known as the benchmark. Three types qualify: an output-based pricing system, a carbon levy or tax on emissions, and cap-and-trade [4]. Where a province or territory has no system of its own, or its system falls short, the federal government puts its own system in place [3].

Industrial Carbon Pricing vs the Consumer Carbon Tax

Industrial carbon pricing and the consumer carbon tax are separate measures. The consumer carbon tax was the federal fuel charge on gasoline, natural gas and other fuels, and its rates have been zero since April 1, 2025 [1][5]. Industrial carbon pricing did not end with it. Environment and Climate Change Canada (ECCC), the federal environment department, says the federal Output-Based Pricing System (OBPS) remains in effect [5].

A 2026 federal law has since repealed many of the fuel charge’s sections. Its repeal of the whole of Part 1, the part of the Act that sets the charge, is listed as not yet in force in the Act current to October 29, 2026 [1].

How the Federal Output-Based Pricing System Works

The federal OBPS is set by Part 2 of the Greenhouse Gas Pollution Pricing Act and by the Output-Based Pricing System Regulations [5]. It applies in the places listed in Part 2 of Schedule 1 to the Act: Manitoba, Prince Edward Island, Yukon and Nunavut [1][3].

Who It Covers

A facility in one of those places is covered if it reported emissions of 50,000 tonnes of CO2e or more for 2014 or a later year, and its main activity is one of the industrial activities listed in Schedule 1 to the Regulations [2]. CO2e (carbon dioxide equivalent) counts each greenhouse gas as the amount of CO2 with the same warming effect. A facility that does not meet those tests can ask the federal Minister to designate it as a covered facility [1].

The Emissions Limit

Each covered facility has an emissions limit for each compliance period, a calendar year [2]. The limit is the facility’s output of each product multiplied by the output-based standard for that product, an amount of emissions per unit [2]. For most activities, the standard falls by 2% of the value set in the Regulations for each year after 2022. Some listed activities have a 1% rate, and one has 0% [2]. The limit grows with output, but each unit of output is allowed a little less every year.

How Facilities Comply

A facility above its limit must provide compensation for each tonne over it: one compliance unit, or one payment of the excess emissions charge, the federal OBPS price per tonne [1][2]. It must pay at least 25% of what it owes as the excess emissions charge, for each compliance period from 2022, so compliance units can cover at most 75% [2]. Compliance units are:

  • Surplus credits, issued to covered facilities that emit less than their limit. One can be used if it was issued no more than five calendar years before it is used [1][2].
  • Offset credits issued under federal regulations, and recognized units or credits from other programs the Regulations accept. These can be used if the reductions or removals took place no more than eight calendar years before they are used [1][2].

Surplus credits can be sold to facilities that need them or banked for later years [5].

Example (round numbers, for illustration only): a facility’s output and standards give it a limit of 900,000 tonnes for the year. It emits 1,000,000 tonnes, so it must provide compensation for 100,000 tonnes, not for all 1,000,000. A second facility with the same limit emits 850,000 tonnes, so it can receive surplus credits for the 50,000-tonne gap.

Deadlines and the Increased Rate

Each covered facility submits its annual report, with a verification report, by June 1 of the year after the compliance period [2]. Compensation at the regular rate is due by December 15 of that same year [1][2].

Compensation not provided by then is due by February 15 of the next year at the increased rate, four times the regular rate [1][2]. For 2026 emissions, that makes the report due June 1, 2027, the regular-rate deadline December 15, 2027 and the increased-rate deadline February 15, 2028 [2].

Budget 2026 proposes to amend the Act to remove the four-times increased rate retroactively and to allow refunds of past increased-rate payments and where emissions information is corrected [7]. It is a proposal, not law.

The Federal Benchmark and the 2026 Price Reset

On May 15, 2026, the federal government set a new path for the headline price: the price per tonne each industrial carbon pricing system in Canada is to set. The headline price per tonne of CO2e is $95 in 2026, $100 a year from 2027 to 2029 and $115 in 2030. It then rises $3 a year to $130 in 2035, and by 1.5% a year from 2036 to $140 in 2040 [3].

Under the 2023 to 2030 benchmark, the national minimum carbon price was to rise by $15 a year from 2023 through 2030 [6]. ECCC says the new path will be part of a full, updated federal benchmark to be published later in 2026 [3]. As of November 19, 2026, its pages still describe that benchmark as coming [3][6]. In its May 15, 2026 agreement with Alberta, Canada committed to make the updated benchmark consistent with that agreement [8].

Industrial Carbon Prices in Canada

For 2026 emissions, the rules in force set $110 a tonne of CO2e for the federal OBPS, B.C. and Ontario, and Alberta’s fund price is $95 [1][10][11][16]. The federal path set on May 15, 2026 is $95 for 2026 [3]. None of these laws sets the new path yet, though Alberta’s single $95 fund price matches its 2026 figure [10]. Each system names its price differently: the federal excess emissions charge, Alberta’s TIER fund price, B.C.’s compliance charge and the price of Ontario’s excess emissions units. These prices apply to the tonnes a facility emits above its limit, and facilities can often use credits instead of paying [4][5].

System In Law, 2026 In Law, 2030 Agreed or Proposed
Federal OBPS (excess emissions charge) $110 $170 Federal path for all: $95 in 2026, $115 in 2030
Alberta TIER (fund price) $95 $95 Agreed with Canada: $95 in 2026, $115 in 2030
B.C. OBPS (compliance charge) $110 $170 No new rates; Canada to negotiate funding for B.C.
Ontario EPS (excess emissions units) $110 $170 Proposed: $95 for 2026, $115 for 2030

Dollars per tonne of CO2e, by emissions year, as of November 19, 2026. Sources: federal [1][3], Alberta [8][10], B.C. [11][14], Ontario [15][16].

For the federal OBPS, the excess emissions charge is set in Schedule 4 to the Act, last changed by an order in 2022. It rises $15 a year from 2026 to 2030, and the 2030 charge carries on for later years [1][5]. Alberta’s order sets one fund price for 2025 and every later year [10]. Ontario prices excess emissions units by the year they are distributed. For on-time compliance, that is the year after the emissions [15][16].

Which Province Uses Which System

Most provinces run their own industrial system. The federal OBPS applies in Manitoba, Prince Edward Island, Yukon and Nunavut [1][3].

Province or Territory System Threshold or Status
British Columbia B.C. OBPS 10,000 or more; some sectors left out
Alberta TIER 100,000 or more in 2016 or a later year, or hydrogen imports over 10,000 tonnes a year
Saskatchewan Output-Based Performance Standards Program Price paused from April 1, 2025; electricity-sector amounts still recorded in 2026-27
Manitoba, Prince Edward Island, Yukon, Nunavut Federal OBPS 50,000 or more in listed activities; others can ask to be designated
Ontario Emissions Performance Standards (EPS) 50,000 or more for 2014 or a later year, in listed activities; 10,000 or more can apply
Quebec Cap-and-trade Linked with California’s system since 2014
New Brunswick N.B. OBPS 50,000 or more; 10,000 to 50,000 can opt in
Nova Scotia Output-Based Pricing System Greater than 50,000; 10,000 to 50,000 can apply
Newfoundland and Labrador Performance standards for large industry 25,000 or more; 15,000 or more can opt in
Northwest Territories Territorial carbon tax with partial rebates Prescribed large emitters

Thresholds are tonnes of CO2e a year, except Alberta’s hydrogen threshold, which is tonnes of hydrogen. Sources: federal [1][2][3], British Columbia [12], Alberta [9], Saskatchewan [17][24], Ontario [16], Quebec [18], New Brunswick [19], Nova Scotia [20], Newfoundland and Labrador [21], Northwest Territories [22].

Saskatchewan paused its industrial carbon price under its Output-Based Performance Standards Program from April 1, 2025, and said it would keep talking with industry about the program’s future [17]. ECCC’s list still shows Saskatchewan with a provincial system, with a note on the pause [3]. Saskatchewan’s first-quarter financial report of August 27, 2026 forecasts higher revenue from the electricity sector, recorded under the program because of federal industrial carbon pricing requirements. It also says SaskPower is recording expenses for those requirements while federal-provincial talks on the future of Saskatchewan’s electricity sector go on [24].

Quebec set up its cap-and-trade system in 2013 and linked it to California’s in 2014 [18]. Nova Scotia’s system uses a carbon price set by the federal government [20]. In the Northwest Territories, large emitters pay the territorial carbon tax and can get partial rebates. In 2026 the territory raised the rebate from 72% to 85% of benchmark fuel volumes, set under territorial rules, in line with the federal changes of May 15, 2026 [22].

Alberta TIER

Alberta’s TIER Regulation (Technology Innovation and Emissions Reduction, Alberta Regulation 133/2019) covers facilities that emitted 100,000 tonnes of CO2e or more in 2016 or a later year, and facilities that import more than 10,000 tonnes of hydrogen in 2023 or a later year [9]. Each is measured against its own emissions-intensity benchmark, an amount of emissions per unit of output, which is separate from the federal benchmark. For each product, a facility gets the less strict of a high-performance benchmark and a facility-specific benchmark [9]. A facility that emits more than its benchmark allows has a true-up obligation: the tonnes it must settle [9].

It can settle up to 90% of that obligation for 2026 and later years with emission performance credits (EPCs, earned by facilities that beat their benchmarks), offsets, sequestration credits and investment credits. The rest is paid into the TIER Fund [9]. This limit does not apply to a facility with a cost containment designation [9]. Alberta’s ministerial order sets the fund price at $95 a tonne for 2025 and every later year [10].

The May 15, 2026 Canada-Alberta Implementation Agreement sets Alberta’s headline price at $95 in 2026 and $100 a year from 2027 to 2029, on the same path as the federal headline price, to $140 in 2040 [3][8]. It also adds a credit price floor: a minimum transfer price for credits used for compliance, from $60 a tonne in 2030 to $110 in 2040. Alberta intends to enact the floor regulation by December 31, 2026. Credits generated before the regulation is enacted are grandfathered and can still trade below the floor within their original expiry periods [8]. These steps are agreed, not yet law. The order in force still sets $95 for 2027 [10].

Our Alberta TIER guide explains benchmarks, credits, expiry and the agreement in detail.

Our Alberta carbon credits guide explains EPCs, offsets, the two registries and how facilities have used credits since 2020.

British Columbia’s Output-Based Pricing System

B.C.’s Output-Based Pricing System became the mandatory carbon pricing system for large industry on April 1, 2024 [13]. An industrial operation must report if it emits 10,000 tonnes of CO2e or more in a year, not counting carbon dioxide from biomass [12]. A reporting operation is regulated, and so is subject to the carbon price, if it first shipped a regulated product on or before March 31, 2024, or if it makes, or is built to make, a regulated product [12]. Energy utilities, electricity imports and operations whose main activity is in agriculture, forestry, fishing and hunting, the utilities sector, or waste management and remediation are not regulated [12].

An operation over its limit can use earned credits and B.C. offset units, or pay the compliance charge [11][13]. Credits and other compliance units can cover up to 50% of excess emissions for 2024, 40% for 2025 and 30% for 2026 and each later compliance period [12]. The Act’s Schedule currently lists compliance periods only to 2030 [11]. The deadline is November 30 of the year after the compliance period [12].

B.C.’s Act sets the compliance charge at $80 a tonne for 2024, $95 for 2025 and $110 for 2026, rising $15 a year to $170 in 2030. Cabinet can change these rates by regulation [11].

Under the Canada-British Columbia Cooperative Prosperity Agreement of July 2, 2026, Canada committed to work out the fiscal impact of the revised benchmark on B.C. and to negotiate a funding agreement that compensates B.C. The agreement’s timeline lists a compensation arrangement for the updated benchmark on or before December 1, 2026 [14]. The agreement does not change the rates in B.C.’s Act, current to November 17, 2026 [11][14].

Our BC Carbon Registry guide explains earned credits, offset units, the credit usage limit and the registry in detail.

Ontario’s Emissions Performance Standards

Ontario’s Emissions Performance Standards (EPS) program, set by O. Reg. 241/19, must cover a facility whose main activity is an industrial activity listed in the regulation and that reported 50,000 tonnes of CO2e or more for 2014 or a later year. A facility with an industrial activity that reported 10,000 tonnes or more can apply to join [16]. A facility that emits less than its limit can receive emissions performance units (EPUs) [15]. A facility over its limit must have enough compliance instruments, EPUs or excess emissions units (EEUs) bought from the province, in its account by December 15 of the year after the compliance period [16]. The price of EEUs is Ontario’s carbon price [15].

The regulation prices EEUs by the year they are distributed, which for on-time compliance is the year after the emissions. Under the rules in force, an EEU costs $110 for 2026 emissions, rising $15 a year to $170 for 2030 emissions [15][16]. On November 2, 2026, Ontario proposed to cut these to the federal path: $95 for 2026, $100 for 2027 to 2029 and $115 for 2030. Comments close December 2, 2026, and the change could take effect as early as January 2027 [15].

Key Dates

  • June 1 every year: federal OBPS annual reports for the previous year are due [2].
  • June 30 every year: Alberta TIER compliance reports for the previous year are due [9].
  • November 30 every year: B.C. OBPS obligations for the previous year are due [12].
  • December 15 every year: federal OBPS compensation at the regular rate is due for the previous year’s emissions [2].
  • February 15 every year: last day for federal OBPS compensation at the increased rate [2].
  • December 1, 2026: the Canada-B.C. agreement’s target date for a compensation arrangement on the updated benchmark [14].
  • December 2, 2026: comments close on Ontario’s proposed EEU prices [15].
  • December 31, 2026: Alberta’s target date to enact the TIER credit price floor regulation [8].
  • Later in 2026: ECCC’s full, updated federal benchmark is to be published [3].
  • January 2027: the earliest date Ontario’s proposed price change could take effect [15].
  • 2030: the headline price is to reach $115, and Alberta’s credit price floor is to start at $60 [3][8].
  • 2040: the headline price is to reach $140 [3].

Tracking the Credit Markets

The laws set charges and fund prices, but not what credits trade for. TIER credits trade bilaterally and TIER has no public price, so lenders and investment committees have no defensible price to underwrite against. Carbon Assessors’ Alberta TIER service covers that market:

  • Price: our daily TIER spot index, published since April 2026, and a monthly assessment built from verified transactions.
  • Trade data: registry transactions pulled daily, with each trade’s date, volume, vintage, buyer, seller and protocol.
  • Supply and demand to 2030: forecasts under your own benchmark tightening scenarios.
  • Policy Watch: amendments, the fund price and federal-provincial agreements as they change.

In B.C., our BC OBPS service reconciles issuance, holdings and retirements down to the project and vintage, tracks every transfer and forecasts supply and demand to 2035.

The Clean Fuel Regulations are a separate federal rule for fuel suppliers, covered in our CFR guide.

For a two-page summary of the 2026 TIER changes, download our free Alberta TIER Market Overview [23]. To talk through your own position, book a call with Albert Ho, our TIER spot price editor, or send us a question.

Common Questions

Is There an Industrial Carbon Tax in Canada?

Yes. The federal fuel charge on consumers has been zero since April 1, 2025, but industrial carbon pricing still applies to large industrial facilities. The federal Output-Based Pricing System applies in Manitoba, Prince Edward Island, Yukon and Nunavut, and a provincial or territorial system applies elsewhere. In most provinces, facilities pay for emissions above a limit set for their output. Quebec uses cap-and-trade, and the Northwest Territories a carbon tax with partial rebates. Saskatchewan paused its industrial carbon price from April 1, 2025. Its August 2026 financial report said talks with the federal government on its electricity sector were still going on.

Who Pays the Industrial Carbon Tax in Canada?

Large industrial emitters. The federal Output-Based Pricing System covers facilities in listed industrial activities that reported 50,000 tonnes of CO2e or more for 2014 or a later year. Provincial thresholds differ, from 10,000 tonnes a year in British Columbia to 100,000 tonnes in Alberta. Under an output-based system, a facility pays only for its emissions above its limit, and can often use credits instead of paying. Quebec's cap-and-trade and the Northwest Territories' tax work differently.

How Much Is the Industrial Carbon Tax in Canada?

Each system sets its own price per tonne. Under an output-based system, it applies to each tonne a facility emits above its limit. On May 15, 2026, the federal government set one path to 2040 for the headline price, the price per tonne every industrial system is to set, as part of an updated federal benchmark due later in 2026. Some rules still list an older, higher path, including the federal schedule and the B.C. and Ontario rates.

What Is the Output-Based Pricing System?

An output-based pricing system gives each large industrial facility an emissions limit based on how much it produces. A facility that emits more than its limit pays a charge or submits credits for the excess, and one that emits less earns credits it can sell or bank. The federal Output-Based Pricing System applies in Manitoba, Prince Edward Island, Yukon and Nunavut. Most provinces run output-based systems of their own, some under other names, such as Alberta's TIER and Ontario's Emissions Performance Standards. Quebec uses cap-and-trade, and the Northwest Territories a carbon tax with partial rebates.

Consumer Carbon Tax vs Industrial Carbon Tax: What Is the Difference?

The consumer carbon tax was the federal fuel charge on gasoline, natural gas and other fuels, and its rates have been zero since April 1, 2025. Industrial carbon pricing, often called the industrial carbon tax, applies only to large facilities, and in most provinces only to their emissions above a limit. It remains in effect.

Will the Industrial Carbon Tax in Canada Increase?

It depends on the system and on which path becomes law. The headline price path the federal government set on May 15, 2026 rises in steps to 2040, but starts lower than the older path, which rose each year to 2030. The federal schedule and the B.C. and Ontario rules in force still follow the older, higher path, and Ontario has proposed moving to the new one. Alberta's order sets one fund price for 2025 and every later year, and Alberta has agreed with Canada to a higher headline price from 2027.

Sources

  1. Government of Canada (Justice Laws Website). Greenhouse Gas Pollution Pricing Act (S.C. 2018, c. 12, s. 186). Current to October 29, 2026; last amended March 26, 2026.
  2. Government of Canada (Justice Laws Website). Output-Based Pricing System Regulations (SOR/2019-266). Current to October 29, 2026; last amended April 1, 2025.
  3. Environment and Climate Change Canada. Carbon pricing systems across Canada. Web page, modified September 29, 2026.
  4. Environment and Climate Change Canada. Industrial carbon pricing in Canada. Web page, modified July 23, 2026.
  5. Environment and Climate Change Canada. Output-Based Pricing System. Web page, modified February 6, 2026.
  6. Environment and Climate Change Canada. The federal carbon pollution pricing benchmark. Web page, modified June 5, 2023; note as of May 15, 2026.
  7. Department of Finance Canada. Budget 2026, Annex 3: Legislative measures. Web page, modified November 5, 2026.
  8. Government of Canada and Government of Alberta. Implementation Agreement for the Canada-Alberta Memorandum of Understanding of November 27, 2025. May 15, 2026.
  9. Government of Alberta (Alberta King's Printer). Technology Innovation and Emissions Reduction Regulation, Alberta Regulation 133/2019 (office consolidation). Current as of December 3, 2025.
  10. Government of Alberta, Environment and Protected Areas. Ministerial Order 13/2025: Technology Innovation and Emissions Reduction Fund Credit Amount Order. May 5, 2025.
  11. Government of British Columbia (B.C. Laws). Greenhouse Gas Industrial Reporting and Control Act [SBC 2014] chapter 29. Current to November 17, 2026.
  12. Government of British Columbia (B.C. Laws). Greenhouse Gas Emission Reporting Regulation, B.C. Reg. 249/2015. Current to November 10, 2026.
  13. Government of British Columbia. B.C. Output-Based Pricing System. Web page, last updated April 13, 2026.
  14. Prime Minister of Canada. Canada-British Columbia Cooperative Prosperity Agreement (backgrounder). July 2, 2026.
  15. Government of Ontario, Environmental Registry of Ontario. Changes to the Emissions Performance Standards program (ERO 026-0935, proposal). Proposal posted November 2, 2026.
  16. Government of Ontario (e-Laws). O. Reg. 241/19: Greenhouse Gas Emissions Performance Standards. Consolidation current to November 13, 2026.
  17. Government of Saskatchewan. Saskatchewan is the First Province in Canada to be Carbon Tax Free (news release). March 27, 2025.
  18. Government of Quebec, Ministère de l'Environnement. The Carbon Market, a Green Economy Growth Tool!. Web page, accessed November 18, 2026.
  19. Government of New Brunswick. New Brunswick's Output-Based Pricing System. Web page, accessed November 18, 2026.
  20. Government of Nova Scotia. Nova Scotia's Output-based Pricing System for Industry. Web page, accessed November 18, 2026.
  21. Government of Newfoundland and Labrador. Greenhouse Gas Information. Web page, accessed November 18, 2026.
  22. Government of the Northwest Territories, Finance. Carbon Pricing in the Northwest Territories. Web page, accessed November 18, 2026.
  23. Carbon Assessors. Alberta TIER Market Overview, October 2026 Regulatory Update. October 7, 2026.
  24. Government of Saskatchewan, Ministry of Finance. 2026-27 First Quarter Financial Report. August 27, 2026.

Information only, not investment advice. Figures set by government are shown as published; agreed future figures can change before they become law. This page shows no market prices.

More Carbon Market Briefs

Alberta TIER

Price the Credits Behind Alberta's Carbon Price

The law sets the fund price, not what TIER credits trade for, and TIER has no public price. Our Alberta TIER service gives subscribers an assessed spot price, every registry trade and each facility's estimated obligation as benchmarks tighten.

Explore Alberta TIER Data

Need a forecast or a compliance plan? Talk to the Advisory Team

Contact Us

Loading the Form…

We use your details to reply to your enquiry. See our Privacy Policy.

Book a Call

Loading the Calendar…

Prefer email? info@carbonassessors.com

Talk to Our Team